BROOF, DROOF, CROOF and FROOF
BROOF, DROOF, CROOF and FROOF refer to different fire rating classifications for roofs according to the European classification system BS EN 13501-5 from the highest to the lowest rating since the national classification system BS 476-3:2004 no longer applied after 2019 and the new Approved Regulations Part B.
BROOF(t4): Refers to the highest rating and indicates the roof system prevents fire penetration for at least 60 minutes and restricts flame spread. It inticates superior resistance to external fire spread, penetration, and burning droplets and is essential for compliance in UK building regulations, often required for flat roofs, terraces, and high-rise developments.
- No penetration of roof system within 60 minutes
- In preliminary test, after withdrawal of the test flame, specimens burn for less than 5 minutes
- In preliminary test, flame spread less than 0.38 m across region of burning
CROOF(t4): The intermediate rating which indicates no fire penetration within 30 minutes, with limited flame spread.
- No penetration of roof system within 30 minutes
- In preliminary test, after withdrawal of the test flame, specimens burn for less than 5 minutes
- In preliminary test, flame spread less than 0.38 m across region of burning
DROOF(t4): The lower rating indicates the system is penetrated within 30 minutes in certain tests, but not in others.
- Roof system is penetrated within 30 minutes but is not penetrated in the preliminary test
- In preliminary test, after withdrawal of the test flame, specimens burn for less than 5 minutes
- In preliminary test, flame spread less than 0.38 m across region of burning
EROOF (t4)
- Roof system is penetrated within 30 minutes but is not penetrated in the preliminary test
- Flame spread is not controlled
FROOF(t4): The lowest rating.
- No performance determined
The Independent Review of Building Regulations and Fire Safety, that followed the Grenfell fire, chaired by Judith Hackitt, reviewed the Building Regulations 2010, and concluded that a more robust regulatory system was neede. As a result the Building (Amendment) Regulations 2018 were issued. The most significant change being the complete ban of combustible materials in external walls and the Approved Document B (ADB) on fire safety, which affected roofing. This is where national classification system BS 476-3:2004, no longer applies but replaced by the European classification system BS EN 13501-5 and the five European class ratings: BROOF(t4), CROOF(t4), DROOF(t4), EROOF(t4) and FROOF(t4).
[edit] Related articles on Designing Buildings
- Blue roof.
- Cold roof.
- Designing out fire risk in roof voids.
- Existing guidance on fire compartmentation in roof voids.
- Flat roof.
- Green roof.
- Metal roofing.
- Pitched roof.
- Shingle roofing.
- Slate roofing.
- Solar panels, pitched roofs and risk of fire spread.
- Tile roofing.
- Thatch roofing.
- Types of roof.
- Warm roof.
Featured articles and news
A detailed description fron the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.




















